Modernize facilities, reduce utility spend, and eliminate deferred maintenance — with little to no upfront capital. Energy Savings Performance Contracting (ESPC) allows public entities to fund critical upgrades using guaranteed energy and operational savings. McClure delivers a turnkey approach—from assessment through verification—ensuring measurable, guaranteed results.
McClure helps you evaluate and secure a mix of funding mechanisms so projects proceed without capital barriers.
(ESPC / GESA): A performance-based procurement mechanism leveraging savings to repay improvements.
Spread payments over time while matching cash flow to energy savings.
Pay only for realized savings while the finance partner assumes the project risk.
Third-party owned solar assets reduce utility costs without capital expenditure.
Stackable funding sources and utility incentives reduce net project costs.
McClure manages every phase—from initial assessment to ongoing performance verification—to ensure projects are delivered with precision.
Investment Grade Audits (IGA), facility condition assessments, and energy master planning identify optimal improvement measures.
In‑house engineering and energy modeling ensure project alignment with technical, code, and owner requirements. We support grant and rebate evaluation and financing suitability.
Our construction teams deliver safe, efficient installation with project management that minimizes disruption.
We track and verify savings via metering and utility bill analysis to confirm performance year after year.
McClure custom‑builds solution packages for your facilities, integrating energy efficiency, modernization, and long‑term sustainability improvements.
High‑efficiency equipment, advanced BMS, and optimization strategies.
LED retrofits, networked controls, and energy‑saving automation.
Fixtures, monitoring, and water management strategies.
Insulation, air sealing, roofing, and energy-efficient upgrades.
Solar, geothermal, and demand response systems.
Electrical distribution, security, and communications modernization.
Facing severe budget constraints, the District partnered with McClure on a solar PPA that now covers 100% of annual electricity needs—projected to save approximately $3.6 million over 20 years.