Owner: UPMC
Location: Mechanicsburg, PA
Delivery Method: Design Build & Design Assist
Project Cost: $26.5M
McClure provided Design Build services for all mechanical and plumbing systems during the initial construction of this 102-bed hospital. Construction included installation of 30,000 lf of medical gas lines, 50,000 lf of plumbing, 25,000 lf of HVAC piping, and 15,000 pieces of sheet metal.
As community needs continued to grow, the hospital had been consistently operating at 90 percent capacity since opening in 2014. In order to meet the needs of area residents, UPMC Pinnacle decided to expand West Shore Hospital by extending additional patient floors horizontally above the existing Emergency Department. McClure Company provided Design Assist services for all mechanical and plumbing systems for the 58-bed expansion, which was completed in 2020.
Features of the expansion include: