Forest Area School District - McClure Company

Forest Area School District

Owner: Forest Area School District

Location: Marienville and Tionesta, PA

Delivery Method: Solar/PPA

Annual Savings: Combined: $601,879

The Forest Area School District

The Forest Area School District partnered with McClure Company to install a 501.6 kW DC Solar PV System, serving 100% of the District’s energy demands. The project included installations at both East Forest and West Forest Schools. The combined Power Purchase Agreement (PPA) is expected to generate over $600,000 in savings for the next 30 years.

The East Forest School’s 175.6 kW DC rooftop solar array was installed in conjunction with a new roof, also completed by McClure in the spring of 2024 as part of a guaranteed energy-saving project (GESA). The 326 kW DC ground-mounted solar array at West Forest School required a new service/meter for interconnection with the local utility that was designed by McClure’s Electrical Engineers.

As part of the commissioning process, McClure conducted an informational and safety awareness workshop for local emergency responders.

Forest Area School District – East

  • Total Project Savings: $210,706
  • Type of Array: Roof
  • System Size (kW): 176

Forest Area School District – West

  • Total Project Savings: $391,173
  • Type of Array: Ground
  • System Size (kW): 326

Project Gallery

24/7

Service
1-800-382-1319

Sign Up for Our Email List:

Harrisburg Office

4101 North Sixth Street
Harrisburg, PA 17110
(717) 232-9743

State College Office

2929 Stewart Drive #203
State College, PA 16801
(814) 238-2384

Western PA Office

40 Pennwood Place
Suite 300
Warrendale, PA 15086
(412) 771-4226

Williamsport Office

4547 Lycoming Mall Drive
Montoursville, PA 17754
(570) 601-4112

Wilkes-Barre Office

1130 Highway Route 315
Wilkes Barre, PA 18702
(570) 270-3037

Maryland Office

60 Aileron Court, Suite 5
Westminster, MD 21157
(443) 289-8584