  • Arcelor Mittal Steel

    Installed a new combustion exhaust system, as well as upgrades to the hydraulic system to accommodate new hydraulic operated equipment. Additional upgrades to this facility continue on an ongoing basis.
  • Holtwood Hydroelectric Plant

    Fabrication and installation of 78-inch pipe to attract migrating shad toward an elaborate fish elevator system.  The expansion included enhancements to the fish lifts to improve the passage for migratory fish along the Susquehanna River.
  • Standard Steel

    Designed and built a 10,000 GPM process cooling water system which included: 3-cell BAC cooling tower, 5 vertical turbine pumps, and 450 KW emergency generator. Project was completed on a fast track shutdown schedule.